Skip to content
  • Eesti
  • English
  • Suomi
AlfaCap
  • Alfacap Group
  • Services
    • Production supervision
    • Quality assurance
    • Project management
    • Consultancy
  • Projects
  • Contact

Peeter

AW-Energy: QC of Power Take-Off system for wave energy converter tube assembly.

Projects / By Peeter

AW-Energy: QC of Power Take-Off system for wave energy converter tube assembly. Read More »

Rauma Marine Constructions OY: Tallink’s car and passenger ferry “MyStar”: Supervising & Quality control for ready outfitted and painted marine hull blocks fabrication in Poland.

Projects / By Peeter

Rauma Marine Constructions OY: Tallink’s car and passenger ferry “MyStar”: Supervising & Quality control for ready outfitted and painted marine hull blocks fabrication in Poland. Read More »

Rauma Marine Constructions OY: Wasaline’s car and passenger ferry: Supervising & Quality control for marine hull blocks fabrication in Poland, 7 ready outfitted and painted steel blocks totally 1460 tons.

Projects / By Peeter

Rauma Marine Constructions OY: Wasaline’s car and passenger ferry: Supervising & Quality control for marine hull blocks fabrication in Poland, 7 ready outfitted and painted steel blocks totally 1460 tons. Read More »

Alfacap Grupp OÜ

Alfacap Grupp Oü was founded in 2004 with the purpose of organising and enhancing cooperation between various companies.

Address

Sepise 1, 11415
Tallinn, Estonia

Contact

E-mail: info@alfacap.ee
Phone: +372 503 9347